ME / Materials, Manufacturing and Industrial Engineering / G Production Planning and Control
Forecasting models — GATE 2027 ME
Medium topic · Materials, Manufacturing and Industrial Engineering (about 20–24 marks in GATE ME) · Module G: Production Planning and Control
Forecasting models is on the official GATE 2027 Mechanical Engineering syllabus under Materials, Manufacturing and Industrial Engineering → Production Planning and Control. GATE A–Z has 3 hand-picked video lectures for it, playing right on the page. Lectures and notes unlock with the full ME paper: ₹49 for 1 year.
More in Production Planning and Control
- Work study
- Productivity
- Aggregate production planning
- Scheduling
- Materials requirement planning
- Six sigma
- Lean manufacturing
- Quality and reliability concepts for product lifecycle analysis
Previous: Productivity · Next: Aggregate production planning
Full GATE 2027 ME syllabus sheet · GATE ME previous-year papers
By Pithani Raghavendra · Last updated